  • POA-2012-00750, M1

    Expiration date: 9/13/2018

    Mr. Roscoe Bicknell IV, with Bicknell Inc., 2275 Brandy Ln., Suite 1, Juneau, AK, 99801, states that the project purpose is to develop centrally located industrial lots. Work being proposed includes the following; • Use a one inch suction dredge to excavate 134,000 cubic yards (CY) of sand and gravel from an area 250 feet wide, x 1450 feet, x 10 feet deep, to a new bottom elevation of -10 feet below the 0.0 foot contour of Honsinger’s Pond that would provide a stockpile of suitable material for grading and for use during future development and additional capacity for dumping of unclassified material. • Discharge 30,734 CY of dredged material into 3.8 acres of palustrine wetlands north of the existing pond and south of Egan Drive (area 1 as shown on figure 7 of 10 dated June 18, 2018), for the development of commercial and industrial lots. • The placement of 221,126 CY of non-frost susceptible dredged and fill material to raise the fill elevation from 21 feet to 25 feet above the 0.0’ contour to cap the 27 acres of unclassified fill in the lacustrine waters that were previously authorized. The capping of the previously authorized fill would allow for the site to be graded for future commercial development. The project site is located within Section 32, T. 40 S., R. 66 W., Copper River Meridian; USGS Quad Map Juneau B-2; Latitude 58.3552º N., Longitude 134.5542º W.; located at the Honsinger Pond along Glacier Highway, in Juneau, Alaska. Please contact Andy Mitzel at (907) 753-2689, by fax at (907) 420-0813, or by email at: andy.mitzel@usace.army.mil if further information is desired concerning this notice.

  • POA-2007-00394-M1

    Expiration date: 8/25/2018

    Shane Smithhisler, stated purpose is for residential/commercial construction of three pads for housing/shops. LOCATION: The project site is located within Section 25, T. 11 S., R. 34 W., Kateel Meridian; USGS Quad Map Nome C-1; Latitude 64.5123° N., Longitude 165.3943° W.; in Nome, Alaska. PROPOSED WORK: The applicant proposes to place approximately 10,000 cubic yards of fill material for the construction of buildings into 3.23 acres of Palustrine emergent wetlands. There would be three residential/commercial developments as proposed on the attached drawings. No access road would be required as portions of the surrounding property have already been filled and an access road was previously constructed. All work would be performed in accordance with the enclosed plan (sheets 1-6), dated August 8, 2018. Please contact Mary Romero at (907) 753-2773, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at mary.r.romero@usace.army.mil if further information is desired concerning this notice.

  • POA-2013-00264

    Expiration date: 9/6/2018

    Mr. Boyd Ables, Post Office Box 749, Glennallen, Alaska 99588, states that the project purpose is to provide road access and easements to lots within the subdivision, a pad for parking, and the construction of a new commercial building. work being proposed is place a total of 10,500 cubic yards (CY) of clean gravel material into 2.3-acres of wetlands. This is an After the Fact permit request that was originally distributed for Public Notice June 20, 2013. The project site is located within Section 21, T. 4 N., R. 2 W., Copper River Meridian; USGS Quad Map Gulkana A-4; Latitude 62.1075° N., Longitude 145.5961° W.; Ables Subdivision, Block 2 & 3, Lot 2, 3, & 4; mile post 184.9 Glenn Highway; in Glennallen, Alaska. Please contact Michael R. Gala at (907) 753-753-2821, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at michael.r.gala@usace.army.mil if further information is desired concerning this notice.

  • POA-2018-00276

    Expiration date: 8/20/2018

    Mr. Jim Erickson, 1676 Fritz Cove Road, Juneau, AK 99801, states that the project purpose is to “replace an old and deteriorated private moorage facility with a safe, more accessible and secure dock for the resident owner”. Work being proposed includes: 1. Remove from below MHW an existing 10 foot wide by 36 foot long timber approach, 30 foot long aluminum gangway, 135 linear feet of sectional hinged beach floats, and a 10 foot wide by 40 foot wide mooring float and six timber piles. 2. Install below MHW a 107 foot long (over two spans of 67 feet and 40 feet in length) elevated aluminum truss approach structure on two bents, each bent supported by two 10.75-inch diameter steel piles with a total of four steel support piles with minimum of 15 feet of embedment; 3. Install below MHW one new 20 foot wide by 60 foot long timber decked, pile-supported (two each 24-inch diameter) float on poly pipe pontoons connected to a six foot wide by 60 foot long steel gangway. The float would be outfitted with domestic water and shore power. Piles would be driven to depth with a vibratory hammer; 4. Place 0.58 cubic yards of concrete and 0.29 cubic yards of clean rock armor rock side slope fill material into 52.2 square feet below the HTL to construct a 4.5 feet wide by 10 feet long retaining wall bulkhead; All work would be performed in accordance with the enclosed plan (sheets 1-2), dated 7-20-2018. The project site is located within Section 35, T. 40 S., R. 65 E., Copper River Meridian; USGS Quad Map Juneau B-2; Latitude 58.356436º N., Longitude 134.646890º W.; USS 1547, TR 1A; 1676 Fritz Cove Road; in Juneau, Alaska. Please contact Randal Vigil at (907) 790-4491, or by email at Randal.P.Vigil@usace.army.mil if further information is desired concerning this notice.

  • POA-2018-00240

    Expiration date: 8/15/2018

    Herschleb Consulting LLC, POC Anne Herschleb. The project site is located within Sections 27 &28, T. 23 N., R. 76 W., Seward Meridian; USGS Quad Map KwigukA-3; Latitude 62.0558° N., Longitude 163.2083° W.; approximately 1.2 miles northwest of St. Mary's, Alaska.. PROPOSED WORK: This proposal seeks to bring into compliance an active gravel material source that has been utilized since 1985. The mechanized land clearing previously occurred within approximately 17.5 acres of Palustrine wetlands and a new proposal would involve the mechanized land clearing of an additional 1.3 acres of wetlands for a total impact to 18.8 acres of wetlands to continue developing a material gravel source in the St. Mary's area. Please contact Please contact Mary Romero at (907) 753-2773, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at mary.r.romero@usace.army.mil if further information is desired concerning this notice.